|
Issue |
Title |
|
Vol 3, No 1 (2021): Prosiding |
PENILAIAN RISIKO K3 PADA OPERASIONAL DERMAGA JAMRUD SURABAYA MENGGUNAKAN JOB SAFETY ANALYSIS DAN BOW-TIE RISK ASSESSMENT |
Abstract
PDF
|
Gustavito Yakobus Egar Yakobus Egar, Minto Basuki |
|
Vol 3, No 1 (2021): Prosiding |
PENILAIAN RISIKO K3 PADA PENYEBERANGAN KETAPANG-GILI MANUK MENGGUNAKAN BOW-TIE RISK ASSESMENT |
Abstract
PDF
|
Nasrululah P. N., Minto Basuki, Pramudya I. S. |
|
Vol 3, No 1 (2021): Prosiding |
PENILAIAN RISIKO K3 PADA TERMINAL NILAM-MIRAH SURABAYA MENGGUNAKAN MATRIK RISIKO DAN FMEA |
Abstract
PDF
|
Dwi Yantono, Minto Basuki |
|
Vol 3, No 1 (2021): Prosiding |
PENILAIAN RISIKO KESEHATAN DAN KESELAMATAN KERJA PADA GALANGAN KAPAL PT. TAMBANGAN RAYA PERMAI (PERSERO) SURABAYA DENGAN MENGGUNAKAN METODE JOB SAFETY ANALYSIS |
Abstract
PDF
|
Vahmy Brata Tsalist, Minto Basuki |
|
Vol 2, No 1 (2020): Prosiding |
PENILAIAN RISIKO LINGKUNGAN AKIBAT AIR PEMBUANGAN AIR BALAS DI PELABUHAN TANJUNG PERAK SURABAYA |
Abstract
PDF
|
Danny Djaya Prakaatmaja, Minto Basuki, Erifive Pranatal |
|
Vol 3, No 1 (2021): Prosiding |
PENILAIAN RISIKO OPERASIONAL DERMAGA BERLIAN SURABAYA MENGGUNAKAN METODE BOW TIE RISK ASSESSMENT |
Abstract
PDF
|
Mei Yanarko, Minto Basuki |
|
Vol 3, No 1 (2021): Prosiding |
PENILAIAN RISIKO OPERASIONAL PADA KMP DRAJAT PACIRAN MENGUNAKAN METODE FMEA DAN BOW TIE RISK ASSESSMENT |
Abstract
PDF
|
Muhammad Fahrur Rozi, Minto Basuki |
|
Vol 2, No 1 (2020): Prosiding |
PENILAIAN RISIKO PEKERJAAN BUNKER UNTUK MENCEGAH TUMPAHAN MINYAK DI ATAS KAPAL SESUAI ISGOTT PADA KM. CAMARA NUSANTARA I |
Abstract
PDF
|
Irma Rif'atus Sholihah, Minto Basuki, Pramudya Imawan Santosa |
|
Vol 2, No 1 (2020): Prosiding |
PERANCANGAN GALANGAN KAPAL UNTUK PEMBANGUNAN DAN REPARASI KAPAL DI DILI TIMOR- LESTE DITINJAU DARI ASPEK TEKNIS DAN EKONOMIS |
Abstract
PDF
|
Julio de Deus Xavier Freitas, Minto Basuki, Pramudya Imawan |
|
Vol 2, No 1 (2020): Prosiding |
PERANCANGAN KAPAL FERRY UNTUK DAERAH PENYEBERANGAN DILI DAN PULAU ATAURO (TIMOR-LESTE) |
Abstract
PDF
|
Mercia Pascoela Gacia Guteres, Minto Basuki, Erifive Pranatal |
|
Vol 2, No 1 (2020): Prosiding |
PERANCANGAN KAPAL PEMBERSIH SAMPAH (TRASH SKIMMER) UNTUK WILYAH PERAIRAN TELUK SUMENEP |
Abstract
PDF
|
Romzatul Widad, Erifive Pranatal |
|
Vol 2, No 1 (2020): Prosiding |
PERANCANGAN SARANA TRANSPORTASI UNTUK ANGKUTAN SUNGAI DI WILAYAH KABUPATEN MIMIKA PAPUA |
Abstract
PDF
|
M. Afriza Krisna Danas, Pramudya I. S. Pramudya I. S. |
|
Vol 1, No 1 (2019): Prosiding |
PERBAIKAN WAKTU HAMBATAN DALAM UPAYA PENCAPAIAN TARGET PENGUPASAN TANAH PENUTUP (OVERBURDEN) SEBESAR 183.000 BCM/BULAN DI PT ARTAMULIA TATA PRATAMA DUSUN TANJUNG BELIT KECAMATAN JUJUHAN KABUPATEN BUNGO PROVINSI JAMBI |
Abstract
PDF
|
Andi Sartono, Doli Jumat Rianto, Irfan Satria Permana |
|
Vol 2, No 1 (2020): Prosiding |
PERBANDINGAN HASIL ANALISIS KERENTANAN AIRTANAH DENGAN METODE SVV DAN DRASTIC BERDASAR LITERATUR |
Abstract
PDF
|
Genadi Toar Nainggolan, Tedy Agung Cahyadi, Nur Ali Amri |
|
Vol 2, No 1 (2020): Prosiding |
PERBANDINGAN HASIL PREDIKSI LAJU EROSI DENGAN METODE USLE, MUSLE, RUSLE BERDASAR LITERATUR REVIEW |
Abstract
PDF
|
Dwi Mayanti Mega Lesmana, Tedy Agung Cahyadi, Waterman SB Waterman SB, Edy Nursanto, Eddy Winarno |
|
Vol 2, No 1 (2020): Prosiding |
PERBANDINGAN KEBUTUHAN ALAT GALI MUAT DAN ALAT ANGKUT (BY REGION VS BASELINE) DALAM RANGKA MENCAPAI TARGET PRODUKSI 82.611.762 TON/TAHUN PADA PT. VALE INDONESIA Tbk, SOROWAKO SULAWESI SELATAN |
Abstract
PDF
|
Kadek Nando Setiawan, Nurkhamim Nurkhamim |
|
Vol 2, No 1 (2020): Prosiding |
PERBANDINGAN METODE NEAREST NEIGBOUR POINT (NNP) DAN METODE INVERSE DISTANCE WEIGHTED (IDW) DALAM MENGESTIMASI KETEBALAN BATUBARA DI KEC. TANAH GROGOT, KAB. PASER, KALIMANTAN TIMUR |
Abstract
PDF
|
Rizky Pratama Pakudewa, Recky Fernando L Tobing, Ratih Hardini Kusuma Putri |
|
Vol 3, No 1 (2021): Prosiding |
PERENCANAAN GENERAL SERVICE SYSTEM PADA KAPAL FERRY RO-RO 300 GT LINTAS PECAH BUYUNG – ALAI INSIT ( Study Kasus di PT. MULTI OCEAN SHIPYARD ) |
Abstract
PDF
|
Alif Nuzul Julianto, Erifive Pranatal, Pramudya Imawan |
|
Vol 3, No 1 (2021): Prosiding |
PERENCANAAN KEBUTUHAN FASILITAS TERMINAL GAPURA SURYA NUSANTARA DENGAN METODE REGRESI LINIER BERGANDA |
Abstract
PDF
|
Dean Musa Pratama Sitompul, Minto Basuki |
|
Vol 2, No 1 (2020): Prosiding |
PERENCANAAN PENAMBANGAN JANGKA MENENGAH DALAM MENCAPAI TARGET PRODUKSI 20.000 TON BATU ANDESIT PT. X |
Abstract
PDF
|
Dhini Andhini, Dedi Yulhendra, Andree Octova |
|
Vol 2, No 1 (2020): Prosiding |
PERENCANAAN PENGEMBANGAN SARANA PENGEDOKAN DI GALANGAN PT.TRI WARAKO UTAMA |
Abstract
PDF
|
Riyan Prayogo Kurniawan, Erifive Pranatal |
|
Vol 2, No 1 (2020): Prosiding |
PERHITUNGAN BERAT KAPAL KOSONG SEBAGAI FUNGSI DARI DAYA MESIN UTAMA |
Abstract
PDF
|
Rifki Fajar, Minto Basuki |
|
Vol 2, No 1 (2020): Prosiding |
PERUMUSAN STRATEGI PEMULIHAN KALI SURABAYA BERBASIS PERAN SERTA MASYARAKAT |
Abstract
PDF
|
Yulfiah Yulfiah |
|
Vol 3, No 1 (2021): Prosiding |
PETA SPASIAL SEBARAN MERKURI PADA AREA KOLAM PENGENDAPAN DARI LIMBAH PROSES AMALGAMASI |
Abstract
PDF
|
Esthi Kusdarini, Resky Tri Putra, Budiarto Budiarto |
|
Vol 3, No 1 (2021): Prosiding |
POTENSI PENYERAPAN LOGAM BERAT PADA TANAH TERKONTAMINASI OLEH TANAMAN AKAR WANGI (VETIVERIA ZIZANIOIDES) |
Abstract
PDF
|
Shahensah Anand Angggian R., Rika Imawati, Tedy Agung Cahyadi |
|
151 - 175 of 211 Items |
<< < 2 3 4 5 6 7 8 9 > >> |