Penerapan Lean Manufacturing dengan Metode Value Stream Mapping dalam Upaya Meminimalkan Waste

Sefrian Akhmad Farizi, Atikha Sidhi Cahyana

Abstract

Small and medium-sized enterprises (SMEs) producing machine components may experience production waste when defective products cannot be recycled; in the observed SME, the defect rate reached 5.31%. This study aimed to identify dominant waste, determine its root causes, and formulate improvement proposals for the turning production process. Data were collected through interviews, direct observation of the production flow, and historical production records, then analyzed using Value Stream Mapping (VSM) to compare current and future states and 5 Why’s analysis to trace root causes. The results identified waiting (19%), motion (10%), overprocessing (9%), and defects (6%) as the main wastes. The initial lead time was 9,605.13 seconds (2.67 hours/unit), while the proposed future state reduced it to 6,780.18 seconds (1.88 hours/unit). The root causes included the absence of preparation SOPs, poorly positioned machine parts, insufficient process standards, and limited operator training. The study concludes that targeted standardization, workplace arrangement, and operator development can reduce non-value-added time and support a more efficient turning production flow.

Keywords: SMEs, Lean Manufacturing, Value Stream Mapping, 5 Why’s, Waste

Full Text:

PDF

References

F. Manta, A. M, C, Q, and A. Basith, R, “Analisis proses pembubutan AISI 1020 pada kekasaran permukaan material dan keausan pahat,” JMEMME, vol. 7, no. 1, pp. 54–63, 2023, doi: 10.31289/jmemme.v7i1.7703.

A. Nurwahidah, M. Mulyadi, and N. Nilda, “Penerapan Lean and Green Value Stream Mapping Untuk Mengidentifikasi Waste Dan Dampak Lingkungan Pada Industri Manufaktur,” ARIKA, vol. 16, no. 2, pp. 65–71, 2022, doi: 10.30598/arika.2022.16.2.64.

D. Harjanto, D and D.P. Karningsih, “Pengembangan Dimensi dan Indikator Lean Assessment Tools Untuk UMKM Di Indonesia,” Prozima, vol. 5, no. 1, pp. 21–29, 2021, doi: 10.21070/prozima.v5i1.1426.

R. Khoeruddin and D. Indrasti, “Analisis Lean Manufacturing Produksi Saus Gulai dengan Metode Value Stream Mapping,” J. Mutu Pangan, vol. 10, no. 1, pp. 15–23, 2023, doi: 10.29244/jmpi.2023.10.1.15.

S. I. A. Wulandari, R. N. Hanun, and A. S. Cahyana, “A model for enhancing the environmental performance by integrating lean and green productivity concept: A case study of food production,” J. Tek. Ind., vol. 25, no. 1, pp. 83–96, 2024, doi: 10.22219/JTIUMM.

C. H. Wahyuni and S. W, Pengendalian Kualitas Industri Manufaktur dan Jasa, 1st ed. Sidoarjo: Umsida Press, 2020.

H. Ponda, F. N. Fatma, and I. Siswantoro, “Usulan Penerapan Lean Manufacturing Dengan Metode Value Stream Mapping (VSM) dalam Meminimalkan Waste pada Proses Produksi Ban Motor pada Industri Pembuat Ban,” J. Heuristic, vol. 19, no. 1, pp. 23–42, 2022, doi: 10.30996/heuristic.v19i1.6568.

A. M. Kurniawan and S. I. A. Wulandari, “Integrasi VSM Dan VALSAT di Lean Manufacturing untuk mengurangi Waste di PT. SPLN Integration,” J. Tek. Ind., vol. 10, no. 2, pp. 217–226, 2024, doi: 10.33506/mt.v10i2.3448.

M. Ilham, Nofirza, H. I. H. Umam, M. Yola, and Anwardi, “Evaluasi Aktivitas Non-Value-Added Dengan Menggunakan Metode Value Stream Mapping Dan Process Activity Mapping,” J. HEURISTIC, vol. 21, no. 1, pp. 1–12, 2024, doi: 10.30996/heuristic.v21i1.10043.

N. N. Suwandi and K. Suhada, “Penerapan Lean Manufacturing dengan Metode Value Stream Mapping untuk Mengurangi Cycle Time pada Bagian Perakitan Spring Mattress di PT X,” J. Integr. Syst., vol. 7, no. 2, pp. 111–133, 2024, doi: 10.28932/jis.v7i2.8694.

I. Komariah, “Penerapan Lean Manufacturing Untuk Mengidentifikasi Pemborosan (waste) pada Produksi Wajan Menggunakan Value Stream Mapping (VSM) pada Perusahaan Primajaya Alumunium Industri di Ciamis,” J. Media Teknol., vol. 8, no. 2, pp. 109–118, 2022, doi: 10.25157/jmt.v8i2.2668.

D. Rosarina, S. Lestari, and C. J. Dinata, “Eliminasi Waste Pada Proses Produksi Malt Powder dengan Metode VSM dan VALSAT,” JT J. Tek., vol. 11, no. 1, pp. 43–52, 2022, doi: 10.31000/jt.v11i1.5593.

R.J. Syalendra, M. Isnaini, H. Umam, M. Yola, and M. Hartati, “Analsis VSM (Value Stream Mapping) Pada Proses Pembuatan Produk Egrek Sawit Di Unit Pandai Besi Asadi,” J. Perangkat Lunak, vol. 6, no. 1, pp. 156–165, 2024, doi: 10.32520/jupel.v6i1.3089.

A A A. P. Wipajung and T. Priyasmanu, “Meminimasi Waste Menggunakan Metode Value Stream Mapping dan Failure Mode And Effect Analysis Pada Lini Produksi Usaha Shuttlecock PROSPEK,” J. Valtech J. Mhs. Tek. Ind., vol. 6, no. 2, pp. 212–219, 2023, doi: 10.36040/valtech.v6i2.7372.

M. A. S. Anuar and M. A. Mansor, “Application Of Value Stream Mapping In The Automotive Industry : A Case Study,” vol. 6, no. 2, pp. 34–41, 2022, doi: 10.15282/jmmst.v6i2.8561.

S. Aisyah, “Perencanaan Lean Manufacturing Untuk Mengurangi Pemborosan Menggunakan Metode VSM Pada PT Y Indonesia,” J. Optimasi Tek. Ind., vol. 2, no. 2, pp. 56–59, 2020, doi: 10.30998/joti.v2i2.4096.

D. R. Ayu and B. N. Alfa, “Pengurangan Pemborosan Dengan Metode Value Stream Mapping Pada Proses Penyediaan Medicines & Consumables Di Perusahaan Jasa Kesehatan DKI Jakarta,” J. PASTI Penelit. Apl. Sist. Tek. Ind., vol. 16, no. 3, pp. 360–373, 2023, doi: 10.22441/pasti.2022.v16i3.010.

I.W.I. Arsa, C. I. Parwati and I. Sodikin, “Pendekatan Lean Manufacturing Dengan Value Stream Mapping (VSM) Dan Kaizen Pada Proses Produksi Tas Kulit,” J. Nusant. Eng., vol. 6, no. 1, pp. 74–81, 2023, doi: 10.29407/noe.v6i1.19906.

I. B. Suryaningrat, H. B. Purnomo, and Fatimah, “Penerapan value stream mapping untuk peningkatan produktivitas produksi okra beku di PT. MDT,” Agrointek J. Teknol. Ind. Pertan., vol. 16, no. 4, pp. 599–610, 2022, doi: 10.21107/agrointek.v16i4.12110.

E. B. Kurniawan and N. L. P. Hariastuti, “Implementasi Lean Manufacturing pada Proses Produksi untuk Mengurangi Waste Guna Lebih Efektif dan Efisien,” Jurnal SENOPATI, vol. 1, no. 2, pp. 85–95, 2020, doi: 10.31284/j.senopati.2020.v1i2.537.

M. Hidayah, H. Murnawan, and R. Prabowo, “Analisa Penerapan Lean Manufacturing pada Sistem Produksi Girders Boxing Fabrication Process untuk Mengeliminasi Waste (Studi Kasus: Departemen Produksi Cranes PT. XYZ),” Jurnal SENOPATI, vol. 5, no. 2, pp. 100–110, 2024, doi: 10.31284/j.senopati.2024.v5i2.5303.

Refbacks

  • There are currently no refbacks.