ANALISA SISTEM MANAJEMEN MATERIAL INSULATION PLAN PADA PROYEK KCR 60M KE-5 DIVISI KAPAL PERANG PT PAL INDONESIA
Abstract
Keywords
Full Text:
PDFReferences
N. Arman Hakim and Y. Prastyawan, “Perencanaan dan pengendalian produksi,” Ed. Pertama Surabaya Guna Widya, 2003.
W. Dhewanto and E. R. P. Falahah, “Menyelaraskan Teknologi Informasi dengan Strategi Bisnis,” Inform. Bdg., 2007.
C.-J. Ho, “Exploring the compatibility of dampening procedures and lot-sizing rules in MRP systems under uncertain operating environments,” Int. J. Prod. Res., vol. 46, no. 18, pp. 5097–5120, 2008.
Y. Arafat, “TA: Sistem Penjadwalan Pengadaan Material dengan Metode MRP di PT. PAL Surabaya Persero,” PhD Thesis, STIKOM Surabaya, 2011.
S. Chandraju, C. C. Kumar, and B. Raviprasad, “Implementation of system application product (sap) materials management (mm-module) in sugar industry for outline agreement, purchasing, release strategy and replenishment,” editor. board, vol. 2, p. 45, 2012.
V. Jha, “MRP-JIT integrated production system,” Int. J. Eng. Res. Appl., vol. 2, no. 4, pp. 2377–2387, 2012.
E. D. Dinesh, A. P. Arun, and R. Pranav, “Material requirement planning for automobile service plant,” Int. J. Innov. Res. Sci. Eng. Technol., vol. 3, no. 3, pp. 1171–1175, 2014.
A. A. Imetieg and M. Lutovac, “Project scheduling method with time using MRP system-A case study: Construction project in Libya,” Eur. J. Appl. Econ., vol. 12, no. 1, 2015.
K. Z. Anggriana, “Analisis perencanaan dan pengendalian persediaan busbar berdasarkan sistem mrp (material requirement planning) di PT. TIS,” no. 3, p. 18.
Refbacks
- There are currently no refbacks.