Analisa Gardu Traksi Boilevard Selatan Akibat Jatuh Tegangan

Santi Triwijaya, Agung Nugroho, Andri Pradipta, Trisna Wati

Abstract


South Boulevard traction substation with the output of the rectifier of 750VDC and 4000A against LRV loading under normal and abnormal conditions. This research was conducted with data sources in the form of specifications for traction substation equipment, 3rd rail specifications, and LRV specifications. The power generated by the South Boulevard traction substation under normal and upnormal conditions will be compared with the LRV load when the headway is narrowed, the train set is added, and the voltage drop is measured. The traction substation is said to be able to bear the load when the power used by the load does not exceed the power provided by the traction substation so that the LRV operation can run. The results of the analysis stated that under normal conditions the capacity of the South Boulevard to Pulomas traction substation obtained the smallest value of 2 minutes headway for 2 train sets at 1806,1KW power with a drop voltage of 30V and the capacity of the South Boulevard to North Boulevard traction substation obtained the smallest value of 2 minutes headway for 2 train sets at 1697,9KW power with a drop voltage of 27,4V. Upnormal condition of the capacity of the South Boulevard to Pegangsaan Dua traction substation, the smallest headway value was 5 minutes for 2 train sets at 1643,2KW power with a drop voltage of 45V and the capacity of the South Boulevard to Equestrian traction substation was obtained the smallest value of 4 minutes headway for 2 train sets at 1651,5KW power a drop voltage of 36,4V.


Keywords


Traction Substation;Headway Narrowing;Trainset;Drop Voltage

Full Text:

PDF

References


C. P. Asmoro and Sudarwati, “ANALISA EFEKTIFITAS POLA OPERASI MRT JAKARTA DENGAN HEADWAY 10 MENIT SAAT PANDEMI: ANALYSIS OF THE EFFECTIVENESS OF JAKARTA MRT OPERATING PATTERNS WITH 10 MINUTES HEADWAY DURING PANDEMIC,” J. Tek. SIPIL-Arsit., vol. 20, no. 2, pp. 129–135, Nov. 2021, doi: 10.54564/jtsa.v20i2.91.

D. González and F. Manzanedo, “Power losses minimization in D.C. electric railways by means of traction substations coordinated voltage control,” in IET Conference on Railway Traction Systems (RTS 2010), Birmingham, UK: IET, 2010, pp. 24–24. doi: 10.1049/ic.2010.0030.

H. Novak, V. Lesic, and M. Vasak, “Hierarchical coordination of trains and traction substation storages for energy cost optimization,” in 2017 IEEE 20th International Conference on Intelligent Transportation Systems (ITSC), Yokohama: IEEE, Oct. 2017, pp. 1–6. doi: 10.1109/ITSC.2017.8317787.

S. Triwijaya, “Optimization of Alternating Current Power Flow Analysis in Railway Electrical System: A Brief Review”.

L. D. Asrar and F. Adhari, “KAPASITAS GARDU TRAKSI MENGURANGI HEADWAY OPERASIONAL KRL JALUR YOGYAKARTA LINTAS SOLO– KLATEN”.

E. Suherman and H. U. Amri, “ANALISIS KAPASITAS DAYA GARDU TRAKSI TERHADAP KEBUTUHAN KRL JALUR PASAR MINGGU-LENTENG AGUNG”.

D. Gookin, Word 2016 for professionals for dummies. in For dummies. Hoboken, NJ: John Wiley & Sons, 2016.

D. Graffox, “IEEE Citation Reference,” Sep. 2009. [Online]. Available: https://www.ieee.org/documents/ieeecitationref.pdf

A. E. Hakim, “Rancang Bangun Kendali Perangkat Elektronika Menggunakan Komunikasi Bluetooth Berbasis Arduino Dengan Interface Android,” JEECAE J. Electr. Electron. Control Automot. Eng., vol. 2, no. 1, pp. 89–94, May 2017, doi: 10.32486/jeecae.v2i1.61.




DOI: https://doi.org/10.31284/p.snestik.2025.7321

Refbacks

  • There are currently no refbacks.


Copyright (c) 2025 Santi Triwijaya

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.