Optimasi Proses Produksi Crumb Rubber untuk Meminimalkan Bottleneck Menggunakan Simulasi di PT. XYZ

Rafli Mido Ramansyah, Yusnawati Yusnawati, Yusri Nadya, Dewiyana Dewiyana, Muhammad Zeki, Meri Andriani

Abstract

Crumb rubber production at PT. XYZ experiences bottlenecks in both wet and dry processes, resulting in raw material accumulation and disrupted production flow. This study aims to determine the standard processing time at each workstation and optimize the production process using ProModel simulation. A quantitative approach was applied using direct observation, interviews, and secondary company data. The results show that the total average processing time required to produce crumb rubber is 14,807.83 minutes. Simulation results identified bottlenecks mainly at the raw material and drying stages. After optimization, the utility value in the drying process decreased from 19.11% to 6.37%, while the drying machine utility decreased from 9.15% to 3.05%. These results indicate that the proposed simulation model can reduce bottlenecks and improve production process efficiency.

Keywords: bottleneck, crumb rubber, promodel, production optimization, simulation

Full Text:

PDF

References

H. Hidayat, D. Susilastuti, and K. Karno, “Pengaruh produktifitas perkebunan karet terhadap ekspor komoditas karet di Provinsi Kalimantan Barat,” JABE (Journal of Applied Business and Economic), vol. 8, no. 3, pp. 278–289, 2022, doi: 10.30998/jabe.v8i3.11977.

G. Resshye, “Pabrik karet di Kecamatan Mandor,” Jurnal Online Mahasiswa Arsitektur Universitas Tanjungpura, vol. 3, no. 1, pp. 108–124, 2015, doi: 10.26418/jmars.v3i1.10177.

D. S. Dewi, H. E. Prasetyo, and E. Karnadeli, “Pengolahan air limbah industri karet remah (crumb rubber) dengan menggunakan reagen Fenton,” Jurnal Redoks, vol. 5, no. 1, pp. 47–57, 2020, doi: 10.31851/redoks.v5i1.4120.

R. A. Nanda, S. Bahri, and Syukriah, “Upaya mengoptimalkan kapasitas produksi crumb rubber menggunakan metode Theory of Constraints (TOC) di PT. Bridgestone Sumatera Rubber Estate,” Industrial Engineering Journal, vol. 1, no. 1, pp. 1–4, 2022.

A. Basuki and A. D. Cahyani, “Metode line balancing heuristik untuk penyeleseian masalah terjadinya bottleneck pada lintasan produksi,” Rekayasa, vol. 13, no. 3, pp. 317–323, 2020, doi: 10.21107/rekayasa.v13i3.19765.

T. Nur, Y. Herdianzah, and M. A. H. Nurdin, “Perancangan model simulasi diskrit pada sistem antrian perbaikan kapal di PT. Industri Kapal Indonesia (Persero) Makassar dengan menggunakan aplikasi ProModel,” Scientica: Jurnal Ilmiah Sains dan Teknologi, vol. 3, no. 1, pp. 943–948, 2024.

T. A. R. Arungpadang, “Simulasi sistem manufaktur: Studi kasus proses produksi brake drum coupling,” Jurnal Tekno Mesin, vol. 1, no. 3, pp. 1–7, 2015.

H. Syahrizal and M. S. Jailani, “Jenis-jenis penelitian dalam penelitian kuantitatif dan kualitatif,” Jurnal QOSIM: Jurnal Pendidikan Sosial & Humaniora, vol. 1, no. 1, pp. 13–23, 2023, doi: 10.61104/jq.v1i1.49.

Y. D. Astanti, I. Soejanto, and I. Berlianty, “Simulasi alur pelayanan rawat jalan (poliklinik) di rumah sakit menggunakan software ProModel,” OPSI, vol. 13, no. 1, pp. 1–5, 2020, doi: 10.31315/opsi.v13i1.3223.

A. Adellia and M. T. Safirin, “Perancangan meja lipat multifungsi yang ergonomis menggunakan metode Pahl and Beitz dan Value Engineering pada mahasiswa aktif di daerah Ngawi,” JATI UNIK: Jurnal Ilmiah Teknik dan Manajemen Industri, vol. 6, no. 2, pp. 26–37, 2023, doi: 10.30737/jatiunik.v6i2.3034.

I. W. Widana and P. L. Muliani, Uji Persyaratan Analisis. Lumajang, Indonesia: Klik Media, 2020.

P. S. Murdapa, C. D. Indrawati, and T. L. Windyaningrum, “Pemodelan dinamis proses produksi batch satu tahap dalam satu mesin dengan memperhatikan waktu loading dan waktu proses,” Inventory: Industrial Vocational E-Journal on Agroindustry, vol. 5, no. 1, pp. 34–40, 2024, doi: 10.52759/inventory.v5i1.192.

R. Linda, M. Meri, H. Fandeli, and D. Hidayat, “Pengukuran waktu baku sebagai dasar pemberian upah insentif di Pabrik Tahu TM Kambang,” Journal of Science and Social Research, vol. 6, no. 3, pp. 813–820, 2023, doi: 10.54314/jssr.v6i3.1491.

A. S. Ramadhani, “Pengukuran waktu baku dan analisis beban kerja untuk menentukan jumlah optimal tenaga kerja pada proses cetak produk lipstick,” Operations Excellence: Journal of Applied Industrial Engineering, vol. 12, no. 2, pp. 177–188, 2020, doi: 10.22441/oe.2020.v12.i2.004.

J. Jeremia, C. C. P. Hardiyanto, S. R. Tirtawijaya, C. K. Yandra, and A. Maxwell, “Simulasi sistem rantai pasokan studi kasus produk telepon di PT XYZ dengan ProModel,” Seminar Nasional Teknik dan Manajemen Industri, vol. 1, no. 1, pp. 17–23, 2021, doi: 10.28932/sentekmi2021.v1i1.58.

P. Asih, “Pengukuran efisiensi waktu proses produksi pada setiap stasiun kerja pembuatan keramik model guci ukuran tinggi 80 cm (Studi kasus pada Home Industri Jaya Ceramik Yogyakarta),” Jurnal Rekayasa Industri, vol. 3, no. 1, pp. 41–50, 2021, doi: 10.37631/jri.v3i1.290.

Y. Mauluddin, K. Yusup, and E. Lesmana, “Perbaikan lintasan produksi untuk meningkatkan efisiensi dengan menghilangkan bottleneck dan penyeimbangan lintasan pada divisi sewing,” Seminar Nasional Teknik dan Manajemen Industri, vol. 1, no. 1, pp. 47–54, 2021, doi: 10.28932/sentekmi2021.v1i1.42.

A. R. Dwicahyani and B. I. A. Muttaqin, “Peningkatan produktivitas IKM melalui perbaikan keseimbangan lintasan produksi (Studi kasus: IKM Mebel di Solo),” Jurnal SENOPATI, vol. 2, no. 1, pp. 51–57, 2020, doi: 10.31284/j.senopati.2020.v2i1.1166.

Refbacks

  • There are currently no refbacks.