Analisis Produktivitas, Waktu, dan Biaya Alat Berat pada Pematangan Lahan Proyek Pondok Pesantren di Sukabumi

Septian Prakoso, Nia Kartika, Hartono Hartono

Abstract

Land clearing work is a crucial initial stage in a construction project, as it significantly affects both the schedule and project costs. This study aims to analyze the productivity, implementation time, and operational costs of heavy equipment—specifically excavators and bulldozers—on the Alkhaled Institute development project in Cikembar, Sukabumi. The methods used include field observation (time study), collection of primary and secondary data, and productivity calculations based on cycle time. The results show that the XCMG XE75DA excavator has a productivity rate of 46.91 m³/hour, while the Komatsu D31EX bulldozer reaches 134.74 m³/hour. The estimated duration of work is around 51 days for the excavator and 59 days for the bulldozer, with a total operational cost of Rp 480,196,000.00. This study provides recommendations for

Keywords

Bulldozer, Equipment, Excavator, Land Clearing, Operational Cost, Productivity.

Full Text:

PDF

References

P. Astuti, Elviyanti, and M. Hafiz, “Produktifitas Alat Berat Excavator Dan Dump Truck Pada Galian Tanah Biasa Di Proyek Pembangunan Kampus III UIN Imam Bonjol Padang,” J. Appl. Eng. Sci., vol. 5, no. 3, pp. 176–185, 2022.

K. A. C. L. Estrellita V. Y. Waney, Sherley Runtunuwu, Deyke Y. F. Mandang, “ANALISIS PRODUKTIVITAS ALAT BERAT DAN HARGA SATUANPADA PROYEK PENINGKATAN JALAN RUAS DALAM KOTA AIRMADIDI,” J. Ilm. Media Eng., vol. 13, no. 1, 2023.

M. N. Eraku, A. U. Sumaga, and M. Y. Tuloli, “Analisis Perhitungan Produktivitas Alat Berat Gali-Muat (Excavator) dan Alat Angkut (Dump Truck) pada Pekerjaan Timbunan Maindam Bendungan Bulango Ulu,” Res. Rev. J. Ilm. Multidisiplin, vol. 4, no. 1, pp. 408–416, Jun. 2025.

R. Hosaini, Hartoto, Alfiana, Charles Darwin Sitindaon, Lina Saptaria, H. N. Ni Luh Sri Kasih, Maisaroh Choirotunnisa, Siti Mardiana, and R. K. Edison Hatoguan Manurung, Manajemen Proyeksi Konstruksi. 2021.

A. Kholil, “Alat Berat,” PT Remaja Rodakarya, Bandung, pp. 1–275, 2012.

E. Handayani, “Efisiensi Penggunaan Alat Berat pada Pekerjaan Pembangunan Tpa (Tempat Pemprosesan Akhir ) Desa Amd Kec. Muara Bulian Kab. Batanghari,” J. Ilm. Univ. Batanghari Jambi, vol. 15, no. 3, pp. 90–95, 2015.

D. Febrianti and Z. Zulyaden, “Analisis Produktivitas Alat Berat Pada Pekerjaan Timbunan,” J. Tek. Sipil dan Teknol. Konstr., vol. 4, no. 1, pp. 21–30, Oct. 2018.

A. B. Listyawan, M. N. Sahid, G. S. Mulyono, and H. K. Fadhlullah, “Analisis Produktivitas Alat Berat Dan Biaya Pekerjaan Pemindahan Tanah Pada Pembangunan RSUD Pondok Aren Tangerang Selatan,” Din. Tek. Sipil Maj. Ilm. Tek. Sipil, vol. 14, no. 1, pp. 8–12, Jul. 2021.

E. N. Kulo, J. E. Waani, and O. H. Kaseke, “Analisa Produktivitas Alat Berat Untuk Pekerjaan Pembangunan Jalan,” J. Sipil Statik, vol. Vol.5 No.7, no. 7, p. 465, 2017.

Y. T. Prasetyo, M. Paradise, and F. Mukarrom, “Productivity Assessment of Digging and Loading Equipment (Cat 330D2L) and Hauling Equipment (Fuso 220PS) in Coal Mining at PT. Bhumi Sriwijaya Perdana Coal, Musi Banyuasin Regency, South Sumatra,” Indones. J. Earth Sci., vol. 4, no. 2, p. A1226, 2024.

E. P. Ramadhan, “Produktivitas Alat Berat Dump Truck Pada Pekerjaan Galian Dan Urugan Tanah Dengan Alat Pemuat Backhoe Pc 78 Proyek Tahap 3 Rs.Siti Khodijah Sidoarjo,” J. Vokasi Tek. Sipil, vol. 2, no. 2, pp. 1–6, 2024.

S. S. Turalaki, J. Tjakra, and R. L. Inkiriwang, “Optimalisasi Penggunaan Alat Berat Terhadap Biaya Pekerjaan Cut & Fill Proyek

Refbacks

  • There are currently no refbacks.