Just in Time on Mechanical and Electrical Implementation in Leedon Hotel Surabaya

Felicia Nuciferani, Diah Listyaningsih, M. Ferdaus Noor Aulady, M.Irsadul Ibad Adde Santoso

Abstract


Mechanical electrical and plumbing (MEP) job is a job in construction project and the implementation is conducted after the workers conduct structural work. The use of materials has an important part from project total cost because waste will be happened if it is used uncontrollable. The aim of this study was identifying JIT application to electrical work in Leedon Hotel Surabaya. The condition before the researcher implemented JIT in Leedon Hotel project, it was identified waste caused by design change, lack of coordination between project and Head Office, and materials availability with excess material stocks. The limited size of the warehouse as MEP materials storage made the material storage not optimal and it had potential to be waste. Applying just in time concept had a focus on waste elimination by planning - needs - use in the field based on the application of JIT method in the Leedon Hotel project. Limited warehouse conditions could still carry out material control without using excess material inventory which had an impact on minimizing the emergence of waste.

Full Text:

PDF

References


I. Soeharto, Manajemen Proyek (Dari Konseptual sampai Operasional), 2nd ed. Jakarta: Erlangga, 1995.

P. M. Institute, A Guide to the Project Management Body of Knowledges (Includes: the standard for project management). Project Manajement Institute, 2017.

I. G. P. A. S. Putra, G. A. P. C. Damayanti, and A. A. D. P. Dewi, “Penanganan Waste Material Pada Proyek Konstruksi Gedung Bertingkat,” J. Spektran, vol. 6, no. 2, pp. 176–185, 2018.

A. Ariesty, M. R. La Ola, and R. Irfanto, “Penerapan Konsep Just in Time pada Proyek Renovasi Gedung CITIE/CIBE/CADL ITB,” J. Teknol. Rekayasa, vol. 3, no. 1, p. 129, 2018, doi: 10.31544/jtera.v3.i1.2018.129-136.

Henri, “Metode Just in Time (Jit) Dalam Pengelolaan Persediaan Pada Pelaksanaan Proyek Konstruksi,” Angew. Chemie Int. Ed. 6(11), 951–952., vol. 2, no. 7, pp. 27–35, 2018.

E. R. Ahadian, “Studi Manajemen Persediaan Just In Time pada Proyek Konstruksi Gedung KPP Menteng,” Techno J. Penelit., vol. 6, no. 01, p. 27, 2017, doi: 10.33387/tk.v6i01.553.

E. B. J. Janson B and I. N. Nurcaya, “Penerapan Just in Time Untuk Efisensi Biaya Persediaan,” E-Jurnal Manaj. Univ. Udayana, vol. 8, no. 3, p. 1755, 2019, doi: 10.24843/ejmunud.2019.v08.i03.p21.




DOI: https://doi.org/10.31284/j.jasmet.2022.v3i2.3045

Refbacks

  • There are currently no refbacks.


Copyright (c) 2022 Diah Listyaningsih

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Mailing Address: Journal of Applied Sciences, Management and Engineering Technology - ITATS Institut Teknologi Adhi Tama Surabaya Jl. Arief Rahman Hakim No.100, Surabaya 60117 email: [email protected] Website : https://ejurnal.itats.ac.id/jasmet/index Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.