Resetting Sistem Proteksi Pada Sistem Kelistrikan PT. Sasa Inti - Gending Plant

Misbahul Munir, Muhammad Rifqi Zhuliansya

Abstract

Sasa Inti Ltd.-Gending Plant intends to increase the load on its electrical system to support factory production activities. Therefore, it is necessary to reset the protection system in the existing electrical system or after planning for additional loads. In addition to resetting the protection system, an evaluation of short-circuit current is also needed for this research. The coordination of the protection system between phase fault relay and ground fault relay was simulated using ETAP software. The results of resetting the protection system would be used to secure the electrical system in the existing system as well as in the planning to increase the load appropriately, reliably, and well at Sasa Inti Ltd.-Gending Plant.


Keywords: resetting, short circuit, protection system coordination, ETAP, existing

Sasa Inti Ltd.-Gending Plant intends to increase the load on its electrical system to support factory production activities. Therefore, it is necessary to reset the protection system in the existing electrical system or after planning for additional loads. In addition to resetting the protection system, an evaluation of short-circuit current is also needed for this research. The coordination of the protection system between phase fault relay and ground fault relay was simulated using ETAP software. The results of resetting the protection system would be used to secure the electrical system in the existing system as well as in the planning to increase the load appropriately, reliably, and well at Sasa Inti Ltd.-Gending Plant.

Keywords: resetting, short circuit, protection system coordination, ETAP, existing

Keywords

resetting, short circuit, protection system coordination, ETAP, existing

Full Text:

PDF

References

Y. Setyaningrum, S. Prasetyono, and ..., “Optimasi Koordinasi Over Current Relay Pada Trafo 60 Mva 150/20 Kv Dan Penyulang 20 Kv Gumul Gardu Induk Banaran Berbasis Particle Swarm Optimization,” J. Arus Elektro …, pp. 1–9, 2021, [Online]. Available: https://jurnal.unej.ac.id/index.php/E-JAEI/article/view/21480.

E. D. Widodo, D. Irawan, and R. P. Astutik, “Analisis Koordinasi Proteksi Relay Arus Lebih Pada Sistem Kelistrikan Pt. Petrokimia Gresik Pabrik Amurea 2 Berbasis Algoritma Genetika,” E-Link J. Tek. Elektro dan Inform., vol. 16, no. 1, p. 1, 2021, doi: 10.30587/e-link.v16i1.2693.

F. H. Abdurrahman, J. Windarta, and M. Facta, “Analisis Koordinasi Dan Setting Rele Arus Lebih Sebagai Pengaman Motor Induksi 6,3 Kv Di Unit Swbd 1 Dan 2 Pltu Rembang Dengan Etap 12.6.0,” Transient, vol. 7, no. 1, p. 260, 2018, doi: 10.14710/transient.7.1.260-267.

B. de Metz-Noblat, F. Dumas, and C. Poulain, “Cahier technique no.158 Calculation of short-circuit currents,” Schneider Electr., vol. 19, no. 83, pp. 1–13, 2011.

M. Madani, T. Suheta, and T. Odinanto, “Analisa Setting Over Current Relay ( Ocr ) Dan Ground Fault Relay ( GFR ) Pada Trafo 60 MVA Di GIS 150 KV Simpang,” Semin. Nas. Sains dan Teknol. Terap., vol. 8, pp. 683–690, 2019.

T. A. Ramanel, “Analisa Koordinasi Sistem Proteksi Dengan Memperhitungkan Arc Flash Pada PT. Pupuk Kujang,” 2018.

IEEE Std 242, IEEE Recommended Practice for Protection and Coordination of Industrial and Commercial Power Systems, vol. 2001. 2001.