PT. Rencana Mulia Baratama is one of the companies engaged in coal mining in Long Beleh Village. The area of WIUP OP owned is 3,993 ha with a Production Forest Area of 2,630.4. The drainage system applied at PT. Mulia Baratama's plan is Mine Dewatering, which is by flowing all runoff water into a well (sump) to be pumped out of the mining area which flows into the settling pond. The well is a place that serves to hold a temporary amount of water before being pumped out The actual volume of the well in pit 1 is 58,000 m3. The planned rainfall period based on the 5-year rain reset period is 179.473 mm/day and the duration of rain is 2.4 hours per day. So that the amount of rain intensity calculated by the monobe equation is 37.39 mm/hour. The total water discharge entering the mining site is 58,817,254 m3/day which comes from runoff water discharge of 13,260,552 m3/day and rainwater discharge of 45,556,704 m3/day. The pumping discharge carried out is 462.4 m3/hour using one type of centrifugal pump 200x150 using Rpm 150 so that the total water discharge that can be drained in a day is 7,398.4 m3/day.

Full Text:

PDF

References


Riswan and D. Aditya, “Analisis Kebutuhan Pompa pada Sistem Penyaliran Tambang Terbuka dengan Persamaan Material Balance (Studi Kasus pada PT TIA),” J. Fis. Flux J. Ilm. Fis. FMIPA Univ. Lambung Mangkurat, vol. 9, no. 1, pp. 66–75, 2017.

S. Syarifuddin, S. Widodo, and A. Nurwaskito, “Kajian Sistem Penyaliran pada Tambang Terbuka Kabupaten Tanah Bumbu Provinsi Kalimantan Selatan,” J. Geomine, vol. 5, no. 2, 2017.

M. Sholichin, Panduan Penyelidikan Lapangan Hidrogeologi. Universitas Brawijaya Press, 2018.

Y. Chandra Sari, S. Suripin, and R. J Kodoatie, “Pendugaan Limpasan Permukaan dengan Modifikasi Parameter Metode Soil Conservation ServiceCurve Number (SCS-CN).” Doctor Program in Civil Engineering, 2017.

M. S. AIR, “Metoda Analisis Kebutuhan Air Dalam.”

R. M. Khalik, T. A. Cahyadi, N. A. Amri, and A. Setiawan, “Kajian Dan Rancangan Sistem Penyaliran Tambang Pada Tambang Terbuka Dengan Studi Kasus Extreme Rainfall,” J. Teknol. Pertamb., vol. 6, no. 2, pp. 106–120, 2021.

Kamiana, I Made (2011). Teknik Perhitungan Debit Rencana Bangunan Air /I Made Kamiana Yogyakarta; Graha Ilmu,2011 xviii + 218.ISBN:978-979-756- 714-9.

HIDROLOGI TERAPAN Prof. Dr. Ir. Bambang Triatmodjo, DEA Dosen Teknik Sipil Fakultas Teknik Universitas Gadjah Mada, ISBN 978-979-8541-40-7, Depok Sleman Yogyakarta.

Arief Rahmat Khusairi Tamrin Kasim, Yunasri "Kajian Teknis Sistem Penyaliran Tambang pada Tambang Terbuka Batubara PT. Nusa Alam Lestari, Kenagarian Sinamar, Kecamatan Asam Jujuhan, Kabupaten Dharmasraya" Jurnal Bina Tambang, Vol. 3, No. 3, ISSN: 2302-3333.

Ferdian Manibuy1, Hendri P Perangin-Angin "Kajian Luasan Daerah Tangkapan Hujan Dan Rancangan Dimensi Saluran Terbuka Jalan Angkut Di Pt. Lintas Artha Kota Sorong Provinsi Papua Barat" Jurnal Penelitian Tambang Volume 4, Nomor 1, 2021.

DR.Ir Rudi Sayoga Gautama "Diklat Kuliah TA-352 Sistem Penyaliran Tambang" Institut Teknologi Bandung 1999.




DOI: https://doi.org/10.31284/j.jasmet.2023.v4i2.5031

Refbacks

  • There are currently no refbacks.


Copyright (c) 2023 avellyn shinthya sari

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Mailing Address: Journal of Applied Sciences, Management and Engineering Technology - ITATS Institut Teknologi Adhi Tama Surabaya Jl. Arief Rahman Hakim No.100, Surabaya 60117 email: [email protected] Website : https://ejurnal.itats.ac.id/jasmet/index Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.