Author Details

Aulady, Mohamad Ferdaus Noor, Institut Teknologi Adhi Tama Surabaya, Indonesia

  • Vol 20, No 1 (2016) - Articles
    Perbandingan Durasi Waktu Proyek Konstruksi AntaraMetode CriticalPathMethod (CPM) dengan Metode Critical Chain Project Management (Studi Kasus: Proyek Pembangunan Apartamen Menara Rungkut)
    Abstract  PDF (Bahasa Indonesia)
  • Vol 28, No 2 (2024) - Articles
    Cost Benefit Analysis of Energy Retrofitting with the Addition of Ventilation Holes in Middle Low-Income Houshold Buildings
    Abstract  PDF